PROY22-038

Equipment supplied: 

Self-reacting mould for T-beams with 10 working lines – 1 unit. The mould features a passive stressing head of 300 t installed at the end of the structure composed of 3 sections of 11,784 meters long. Thus, the whole length of the mould is 35, 4 meters.

 

Related