• 3D prefabricated bathroom units (PBU):
    • For casting monolithic elements comprising of the walls and the floor slab obtaining elements with great structural resistance
    • Increase in construction productivity and a substantial reduction of on-site installation
    • The exterior mould walls are hydraulically activated and an innovative system designed by Moldtech allows automatically collapsing the inner pod by hydraulic cylinders activated by a hydraulic pump.

    2 turning devices to turn the elements 180º with a total capacity of 40Tn, able to turn swiftly and safely 3D elements with great dimensions.

Contact an expert from our team now

Related Projects

Scroll to Top