1. A 100-meter-long universal bed base with a working capacity of up to 650 tons.
  2. A set of mold sides for the production of “L”, “T” and “rectangular” beams of 36 meters long.
  3. Two masks for prestressing of 650 tons.
  4. Two lifting rockers of 5 meters in length with 25 tons capacity each.
  5. Two concrete transport and pouring hoppers with 2 m3 capacity.
  6. A vibrating screed of 4.5 meters long.

 

Связанный