EQUIPMENT FOR A NEW PRECAST PLANT IN CASABLANCA, MOROCCO

  • Universal track with working capacity up to 600 tons
  • Together with the complementary moulds of the track, they will allow the production of “I-beams” for covering large spans, and “rectangular beams” for supporting joist slabs and hollow-core slabs.
  • The complementary auxiliary equipment is also supplied by Moldtech: hydraulic systems for pre-stressing and relaxation of cables and strands.
  • The local presence, experience and technical mastery of Moldtech’s prefabrication engineering have been the key to this project
  • Our team has worked hand in hand with the client to define the construction system and to adapt it to the specific needs of the housing and industrial building development used in Morocco.